HVAC Supervisor
Описание
CURRICULUM VITAE
Ali Hossein Pour Azad
PERSONAL INFORMATION
Name & Surname: Ali Hossein Pour Azad
Birth Date & Place:01.09.1963 ,South Azerbaijan, Iran
Marital Status: Married
Address: Muğla / TURKEY
Contact detail: hosseinpz@gmail.com
+905383625995
Military Status: Completed in
EDUCATION
1984 - 1990 : Iranian Science & Technology University
Bs. Mechanical Engineer (heat & fluid)
Mazandaran Technical University
MS. Industrial Engineering (Systems Management & Productivity)
MAIN QUALIFICATIONS: Project management and leadership (IHIM)
Project financing, LC and banking operations (IEO)
Projects Logistics and customs clearance (IEO)
ASNT-TC-1A RT,UT,MT,PT,VT Lev. II (ABS & TUV)
First Aider (Turkish Health Ministry&TAQA)
BOSIET ( Sankt Petersburg Marine Academy)
Buildings Mechanical systems national codes & standards (HVAC and Lifts)-Iranian Mech. Eng.As.
CARRIER VRF program, CARRIER HAP 6.1
WORK EXPERIENCES (25 years Oil/Gas and Power projects & Construction managing and engineering- zero accident/incident record)
15.05.2020- Current
Agessa Technology - Tashkent
Project Manager
EPC project execution included Public Buildings, Hospitals and Hotels Heating, Cooling , Ventilation and Plumbing works.
Uzbekistan Tax Ministry
Tibbiyat Dunyası Hospital
Corona Virus Center Hospital Dialysis facility
Medex Textile water softening
4 stars Hotels HVAC design, Budgeting and Execution
31.03.2019- 15.12.2019
North Iraq- Kurdistan Region
ORYX (US based Oil/Gas Co.) wellhead facilities and Pipeline project construction manager (Base to API 1104 and ASME B 31.4 codes.
The project contains:
8" x-52 pipeline included survey, trenching, right of way, stringing, construction, pigging and 148 BRG testing
Two sets wellhead facilities included spools pre-fab. Flushing and testing 152 BRG, fluencing Hydrocarbon and commissioning.
Palpsht Co. (DNO Project)
As Construction Manager:
DNO TAWKE CPF under grand & above grand piping works.
The project has been completed in accordance to international standards and DNO specifications.
Full Tech. Co. (HAVATEK-HKN Project- US based Oil/Gas Co.)
As Project Manager/Construction manager
Project was 8'' export line in highly steep slope of SARSANG-ATRUSH region. The slope is around 62% and we run in best manner with zero accident.
30.05.2018 - 31.12.2018: Silver Teknik A.S - Ankara/Turkey
Production Manager
included:
Below EPC contracts ruling, containes QA/QC , Procurement, Manufacturing and Transportation of manufactured parts and 3rd parties coordination in accordance to defined ITP.
North Iraq Khormala power plant Tank Farm EPC,
Mozambique Fuel Tank Farm EPC.
Hatay-Turkey Rubis fuel terminal Project Steel Structure and Tanks project
The projects has been designed in accordance to ACSE Codes, AWS, API 620 & API 650 and ASME B31.3 for piping systems.
The piping system Spools and Supports are prefabricated in Turkey, then packaged by associated Line and Isometric number forwarded to erection and installation yard. All TIG/SMAW weld joints completed base to designed/approverd ITP, WPS and relevant PQR documents.
30.01.2017- 30.05.2018 : Dal Teknik A.Ş-Istanbul
As Project Manager and Senior Technical Consultant,
EPC Cement plants in Uzbekistan.
SURXANDERYA 3000 TPD CEMENT PLANT: Cyclones and Rotary Kiln shells are manufactured on place by employing SAW and SMAW methods in plant location then installed successfuly.
Plant has caontained a modern Industrial and Potable water treatment plant' and 15 MW waste heat recovery power plant (WHRP).
ZOMIN CEMENT PLANT: The capcity up graded from 150TPD to 400 TPD by designe and mounting of a pre heater tower' system. Further to overal Project management I performed the designe by using ANSYS FLUENT Ver.18. for calculating associated Gas channels, preheating cyclones, Chimney systems.
As Project manager I completed the activity starting from Geotechnical Survey, Leading the Designe Team, Soil and Civil Works , Mechanical erection and welding activities till completion of Electrical and Instrumentation Works and sucessful start up activity.
Dec. 2016 -30.01.2017: North West Co. (Pasha Holding) Azerbaijan- Touz Irrigation project
As a,
Construction Manager
Project contains 16 Km OD 1700mm steel pipeline for water supply to field area in Cauca's mountains.
As construction manager I organized 4 independent fit up and welding crew totally 120 welders which chosen among locals and qualified them by BV in place.
The project completed in 2 months and 16000 Hectares planted wheat farm irrigated as result.
Nov. 2015- Dec. 2016 : VEMAK Construction Co.- Ankara
As a,
Construction Manager
Trans National Natural Gas Pipeline Project (TANAP)-Turkey
Project contains 400km X-70 Pipeline and Tie-In construction by Automatic FCAW process in high altitude Anatolia region. Client was Sicim-Yuksel-Akkord (SYA) consortium.
I calculated more than 250 sorts of various heavyLifting Plan and managed huge Rivers, 3 rail road, 5 first class Asia-Europe international road crossings.
The world recorded heavy job completed with ZERO Accident/ Incident records.
As a,
Project Manager
Atrush main Petroleum Pipeline and Pumping station project (TAQA)-KAR GROUP, passing high altitude north Iraqi trains included rack blasting and steepy slopes works.
Dohuk, KURDISTAN/IRAQ
2014-2015: YTL Energy and Engineering Co.-Istanbul
As a,
Senior Project Engineer /Construction Manager
Potable and Firewater tanks with Pump stations,
water treatment and associated facilities EPC in
Baziyan , Sulaimaniyeh /KURDISTAN/IRAQ
DESCRIPTION : AS project Senior Engineer I managed Project Coordination, Technical management and Planning and QA/QC management roles.
Further to Engineering/Construction works, I performed all UT examinations (ASNT-TC-1A Lev.2).
The project was contained various type of SS316 and A335 materials.
Jun.2010-Aug.2014: Petro Gas FZE-Turkmenistan
As a,
Senior Project Engineer /Deputy Project manager
PETROFAC South Yoloten Gas plant (Kalkinish field) project works included Gas Gathering/Condensates/MEG pipelines through wellheads to 8 sets of GUT continue to main GP and Plant utility construction in KARAKUM Desert, Mary, TURKMENISTAN
DESCRIPTION : South Yoloten Plant (PETROFAC) huge facility (worldwide second biggest unique field) included:
20 sets of wellhead facility installation and total 120km sour gas gathering pipeline comprised Sour Gas, condensates, Reached MEG, MEG and water lines in KARAKUM harsh geological/Climate and conditions. Project was included BVSs, Railway and Main road open cut & casing crossings, Murghab River passage through pile supported 120m bridge.
Completing 4 units of Utility section piping works included: around 500000 in-dia CS/LTCS, SS, INCO, Duplex, Super duplex piping works. The piping system was included A333-6, A105-N, A350-LF2 (PN-1,2), A312TP 316L (PN8) , B423 (PN45) with supports, Flange Management and Reinstatement activities.
As a,
Senior Project Engineer
PG Representative on Board Pipe Lay vessel/
Deputy Project Manager
Offshore/Onshore trunk line, infield lines and risers installation
In Caspian Sea, Turkmenistan offshore Oil fields
DESCRIPTION : Review all Drawings, alignment sheets, procedures and all other Engineering package for finalizing AFC versions. Review the contract /subcontracts, attached specifications and standards for leading all involved project crew & fleet moving on contract requirement pad. Managing the logistic group for on-time coated pipes supply to laying vessel, Land and Sea Transportation, Customs Clearance and tens of giant marine fleet provisions/bunkering works. Tally Controlling of the transportation ship's (five sets) for assuring Pipe-Lay barge & alignment sheet requirements. Coordinating offshore crew (14 nations on board), Coastal supporting of team, involved international survey & supply companies relationship and Coastal state organizations for achieving to the project scheduled goals. Successful executıon of 35km 30" offshore trunk line and two sets in-field 20" pipeline for connecting LAM 22 and LAM A, ZHDANOV oil field platforms to Trunk line. Execution of three sets Risers as "Hot Work" criteria in SH2 and alive flairs area. Free span survey and correction, cathodic protection survey and correction, Barred Tee connections, Sub Sea valves connection, Pre-ccommissioning, Commissioning and HC induction, close out report.
Completion of 15 km 30" Onshore part of line with 2 main road (Category One) bypass and "open cut" crossing, Central Asian international railroad crossing , sets of existed pipeline cross, 320 KV aerial power line cross with higher categorized state environmental protection rules.
I managed full project WPS and ITP in accordance to API 1104, DNV-OS-101 and Finite Element Engineering Assessment for Cracks by using ABAQUS and ANSYS programs (ECA)
All project spectrum analysis completed by AUTOPIPE and Offpipe software due to DNV rules.
As a,
Project Manager
ENI Turkmenistan Crude Oil storage & Firewater tank farm EPC
BURUN Field (ENI), Balkanabad , TURKMENISTAN
DESCRIPTION : EPC Tank Farm and associated buildings in accordance International and state codes for Crude Oil storage /facilities and Firewater systems for Eni Turkmenistan. Project was included two sets 10000 m3 of crude oil and sets of 2500 m3 firewater tanks with complete loading and offloading facilities and lines. The project was base to API650, AWWA100 and ASME B31.3 rules as well as GOST, VCN and TMS for civil works.
As a,
Tender Manager in
Ashgabat, TURKMENISTAN:
PETRONAS offshore platforms EPCCI
PETRONAS Costal Fabrication yard
DRAGONOIL/PETROFAC HAZAR Offshore Platforms/Jackets fabrication yard.
DRAGONOIL Offshore/Onshore 30" pipeline ZHDANOV field
German RWE, EPC Coastal directional drilling rig platform & Foundation, Living & Office accomodations.
0ct2008-June2010: ISOICO (Iranian shipbuilding and offshore industries complex)- Iran
As a,
Project Manager
NIOOC Bahragansar / Hendijan Offshore Oil field Ultra Shallow waters EPCCI project (Water depth at lowest tide was1.8m only) in
Persian Gulf, Iranian waters
Repair and Maintenance of Ocean Going Ships Steam Boilers
DESCRIPTION : Scope of work was included:
Engineering, Procurement, Fabrication, Weighing, Load Out, Sea fastening, Transportation and installation of two sets of 8 slots Oil Wellhead/Drilling/Manifold offshore platforms and Jackets.
The Jackets were 1200 MT weight and each of Platforms ~2000MT. Load out completed by SMPT method and sea transportation was performed in 600 miles distance from operation point. Operation happened in active x-mass tree with minimum shut down period in very précised timing with High & Low tide periods. The sea water depth was only 1.8 m and this made a high challenge activity for project staff and heavy lift, umbilical and pipeline laying fleet safe operation.
Challenge was in Very Shallow Offshore vicinity for Heavy Coated Pipeline and umbilical Lay works (with lowest tide sea depth 1,8).Comprised, 5km 12" heavy concrete coated pipeline, 35km compound (Power-Control-Communication) subsea umbilical .
Shut down management and working in H2S area.
The project was used, MZ, API X70 pipes for jacket and platform components and various Sour Service materials for process and manifold components: Applied material for piping systems were INCONEl, Duplex, Super Duplex , Cupper , FRP and LTCS.
May2007-Oct2008: Ahankub Co.-Iran
As a,
Project Manager
Iran-Pakistan natural gas pipeline Construction project (56" OD)
South of Iran to Pakistan border
DESCRIPTION : EPC Project Manager for part of Iranian 7th natural gas supply line to Pakistan border. Scope of Work was included 50 kilometers of 56" diameter onshore pipeline Construction and Pre-commissioning in Zagros Mountains region.
Project actualized in Zagros Mountain with hard sediments and non-stable geo structures with enormous sag/over bend slopes. The path contained tens of wide and tumbling rivers underground crossings by changing the river path and open cut method.
Further to convoluted natural difficulties, we had huge efforts for solving legal problems with Landowners, local inhabitants and native tribes. The sag and over bends was in final limits and for solving of slops problems, we had enormous rock cutting activities, concrete anchorage, etc.
Nov 2006-May2007: OIEC (IR State Oil Industry Engineering Co.)-Persian Gulf
As a,
Project Manager
LNG jetty Pile drawing and "ashore/pipe rack"
Siri Island, IRAN
DESCRIPTION : Project included Construction, Installation, HUC of complete LNG Export Jetty, transport pipeline and offshore loading facilities for NIOC.
The project was establishing an offshore pipe rack, complete facilities and offshore bridge for exporting 80,000,000 cf/d produced LNG at the Siri area gathered gas from Gulf offshore platforms. The project also included the construction of a large dolphin structure for mooring application of large marine tankers.
Scope of Work included the complete offshore component manufacturing, offshore pile driving (impact diesel hammer and hydraulic vibrator hammer), top side installation and offshore concrete works.
Responsibilities was included all engineering, manufacturing, load out, offshore construction and commissioning.
Feb2005-Nov2006: SADRA, COWI (Denmark) & JAKOBSEN (Norway) Joint Work-Iran, Azerbaijan
As a,
Offshore Project Manager
Urmia Lake Causeway Bridge Construction
West Azerbaijan, IRAN
DESCRIPTION : Scope of work included installation of 18 set of (each) 400 MT concrete caissons associated with 420 sets of 32 inch diameter 90 m long inclined piles.
Operation was included fabrication, load out, towing and positioning on location and installing of 35,000 MT of steel structure topside in high salty waters (300 gr/l of salt content) under rough environmental condition of western Azerbaijan.
July2004-Feb2005: TEPE-NACAP JV.- Turkey
As a,
Automatic welding (SERRIMER DASA 4) and Tie-in Operations Manager
Lot C Baku - Tibilisi-Jeyhan Petroleum Pipeline Project
TURKEY
The project was performed by using FSAW welding wire for highest performance. Daily welded line record was 1,5 km without any defects.
Posof Mountains 2400m altitude was done by SMAW with world recorded low defect.
May2003-Jun2004: SAIPEM-SADAF CONSORTIUM-Persian Gulf
As a,
DEPUTY PROJECT DIRECTOR
Persian Gulf , Iran waters
DESCRIPTION : South Pars Phase 4&5 Offshore/Onshore Pipeline and Feed Facilities - SAIPEM Consortium for Eni (AGIP) project (water depth = 0~75m).
The project was EPCI and contained procurement of 12500 X2 pieces of 32" & 4" line pipes and Whole components from various global based suppliers. Sea and Land Transportation from Manufacturers origin, corrosion PROTECTION and concrete WEIGHING coating, load out and sea fastening and laying, pre-commissioning, commissioning.
As a world record the project completed 4 months sooner than scheduled time.
JUN 2001-May2003 : IOEC-Iran
As a,
Construction Manager
Bahregansar Central Process Facility EPC project in
Boushehr, IRAN
DESCRIPTION : Construction Manager for 69000 b/day capacity CPF of offshore exported mixed oil.
Project was included earth preparation, civil, structure, mechanical, piping and EIC works and commissioning activities.
As a,
Construction Manager
IOEC(Iranian Offshore Engineering and Construction Corporation)
Construction manager of South pars Phase1 in
South Pars Energy Region of IRAN
DESCRIPTION : 3000 MT Jacket (included piles) manufacturing (Roll Up Method), Load out by skidding system and Offshore Installation (Launching Method)- Using AB 110 & AB 1200 offshore operation bargs.
For actualizing the project we used international well known FUGRU surveyor crew and NOBEL DENTON classifying services.
Sep2001-Sep2002: ISOICO-NPCC/Iran-UAE
As a,
Deputy Project Manager/ Pre-comm. & Comm. Manager
Phase 2&3" Production Platform EPC,in
Bandar Abbas IRAN
DESCRIPTION : Manufacturing and Load Out of "South pars gas field PRODUCTION PLATFORM included 2500 MT platform manufacturing and load out. Manufacturing of all accessory structures, offshore bridges, flare towers.
The project was contained:
4 decks comprised 24 slots equipped with INCONEL high schedule pipes for High Temp/High pressure well heads of extracted Natural Gas and Condensates.
The project employed more than 1200 personnel in pick for completion of Platform. There was High Alloy Steel, Cupper, SS316L, INCONEl, Copper , FRP pipes in very convoluted shape for completion of platform system.
For better managing of project we stablished a modern local Calibration laboratory of Instruments.
May2000-Sep2001: AZARAB INDUSTRY COMPLEX- Bushehr/IRAN
As a,
QA/QC Engineer
Bushehr Nuclear Power Plant
DESCRIPTION: Project was included sets of steam turbines piping spools prefabrication and installation with all components and fittings, Fabrication and installation of Steam Generator room Steel Structures and overhead cranes. Cooling tower components, associated components& circulation pumps
May1998-MAY2000: IOEC (SHL Netherland-SHAW QED UK)
As a,
QA/QC MANAGER (Joint work with SHAW QED Pipeline)
Abouzar Offshore Oil Field Development,in
Persian Gulf
DESCRIPTION : QA/QC Manager for Manufacturing and offshore installation of 4 sets of West "Abouzar" drilling and wellhead Platforms.4 set Jackets and pile driving, wellhead connection and commissioning(On board AB DLV1200).
Aug1993-May1998: AZARAB INDUSTRY COMPLEX (CHEK EXPORT/ IHI Japan)
As a,
Project Engineer
IRANSHAHR steam Power plant, in
IRAN
DESCRIPTION: Estimating, Planning, Assembling and Installation of two set of "super critic" Steam Boilers. Installation and commissioning of Steam Turbines, overhauling existed two sets steam Turbines.
As a,
QA/QC ENGINEER
EPC Qazvin steam Power plant, in
IRAN
DESCRIPTION : QC engineer and Project Coordinator for Manufacturing, Installation and commissioning of 4 sets of 400 MW steam boilers and utilities.
Project was included Japan technology transfer program for turnkey, various steam boilers Design and Manufacturing works.
As a,
Project Engineer
Montazer Qaem combined cycle Power Plant (Total 625 MW),in
IRAN
DESCRIPTION : Project was included 4 sets of Gas turbines with all components and stacks, Fabrication and installation 4 sets of Steam Generator Harps and all Steam Power units, included GE / Alstom steam Turbines & direct coupled Generators, Condenser boxes, Feed Pumps, down comer, etc. Super heaters and associated burners. Cooling towers, associated components& circulation pumps.
May1992-Aug1993: SADRA GROUP-RAUMA REPOLA OY (FINLAND)
As a,
JACK UP RIG LEGS MANUFACTURING MANAGER
Of Friede & Goldman Ltd.
designed Offshore Drilling Jackup ,in
Neka, IRAN
DESCRIPTION: Production manager of IRAN-KHAZAR offshore drilling jack up rig self-elevated legs, under supervision of US ABS with Finish RAUMA REPOLA OY.
Jun1991-May1992: Azarab Co. (IHI Japan)- FARS HRSPP
As a,
Manufacturing Manager
DESCRIPTION : Project was included 2 sets of Gas turbines Ducts with all components and stacks, Fabrication and installation 2 sets of Steam Generator Harps and all Steam Power units, included GE / Alstom steam Turbines & direct coupled Generators, Condenser boxes, Feed Pumps, down comer, etc. Super heaters and associated burners. Cooling towers, associated components& circulation pumps.
Jun1990-Jul1991: AZARAB INDUSTRY COMPLEX
As a,
Manufacturing Engineer
Power plants parts manufacturing ,in
Arak, IRAN
DESCRIPTION : Power plants boilers and pressure parts , Steam Wall, Down comer, Economiser manufacturing, and manufacturing of Utility Package Boilers, Cement plants Rotary kiln, rotary and stationary parts manufacturing
OTHER QUALIFICATIONS
All Microsoft Applications (Expert User)
AutoCAD (Expert User)
ANSYS v.18 Finite Element Analysis (Expert) Stress Analysis/CFD analysis
ABAQUS Finite Element Analysis (Expert)
CAESAR II Piping/Under Ground Pipe Line Design Package (Expert)
CATIA v.6
Visual Basic
Primavera P6 (Expert Planner)
Ms Project (Expert Planner
HAP 4.9
OTHER QUALIFICATIONS & TRAININGS
HSE and H2S protection
Quality Assurance & Inter Organization Audit
Welding Engineering, WPS and PQR preparation
Stress Analysing (ANSYS , ABAQUS)
Piping Design CAESAR II
Official and Off Road Driving Licence
HSE in HARSH environment work vicinity
First aid and Recovery (US Army Specialists-Iraq)
MANAGEMENT ROLES AS
Site Engineer, Project Engineer, Chief Mechanical Engineer, Construction Manager, Fabrications Lead, Project Manager, Operations Manager, Deputy General Manager, QA/QC manager, Planning & Project control manager
LANGUAGE SKILLS
English Fluent, Turkish Native, Russian Fluent, Arabic- Kitabet Fluent, Persian Native, All Central Asian Turkic Languages, Kurdish-Fluent
Familiar with Italian and Portuguese (Reading and Understanding)
24 июля, 2023
Юлия
Город
Мурманск
Возраст
54 года (24 ноября 2024)
30 октября, 2016
Трофим
Город
Мурманск
Возраст
34 года (10 января 1990)
30 октября, 2016
Владимир
Город
Мурманск
Возраст
65 лет (10 января 1959)